Country: Israel
Year the project was carried out: 2016/17
Main contractor: Omer Construction and Engineering

Diameter outside silo: 29,70m
Slipform start at height: 0,00m to +56,90
Diameter inside silo: 19,00m
Slipform start at height: 25,70m to +49,40

  • Nesher 1
  • Nesher 2