Country: Poland
Year the project was carried out: 2014
Main contractor: Constrem Sp. z. o. o / PKN Orlen S.A.
Outer diameter: 16,60m

Assembling height: 15,52m
Sliding height: 13,47m
Height of the Building: 28,99m

The project consisted of building two silos.