Country: Chile
Year the project was carried out: 2013/2014
Main contractor: Commonwealth Dynamics, Inc./ Empressa Electrica Guacolda S.A.

Diameter Start: 10,67m
Diameter Top: 8,0m
Height: 78,6m

  • Guacolda1
  • Guacolda2
  • Guacolda3
  • Guacolda7
  • Guacolda5
  • Guacolda6
  • Guacolda7