Country: Poland
Year the project was carried out: 2015/2016
Main contractor: Constrem Sp. z. o. o

Outer Diameter Chimney: 6,0m
Height: 30,0m
Outer Diameter Silo: 32,8m
Height: 33,7m

  • Beitragsbild Czestochowa
  • Czestochowa 2
  • Czestochowa1