Country: Poland
Year the project was carried out-Silo 1&2: 2013
Year the project was carried out-Silo 3&4: 2014
Main contractor: COMAX-BUBOWNICTWO I ENERGETYKA Sp. z o.o./GÓRAŻDŻE CEMENT S. A.
Outer diameter: 17,0m

Height: 43,7m

The project consisted of building four cement Silos.

  • Silo 1&2_1
  • Silo 1&2_2
  • Silo 1&2_3
  • Silo 1&2_4
  • Silo 3&4_5
  • Silo 3&4_6