Country: Poland
Year the project was carried out: 2015
Main contractor: Constrem Sp. z. o. o / Eurosilo

Outer diameter: 30,80m
Height: 57,40m

  • Kozienice 1
  • Kozienice 2
  • Kozienice 3
  • Kozienice 4