Country: Slovakia
Year the project was carried out: 2015
Main contractor: OMEGA-ENERGO SK, s.r.o.
Outer diameter tank 1 and 2: 23,60m
Outer diameter tank 3: 30,60m

Height tank 1,2&3: 8,0m

The project consisted of building three biomass tanks.

  • Tisinec-1
  • Tisinec-2